A timeline example shows events in date order on one slide. Pick the layout by the job: a horizontal line for 4 to 7 milestones, a vertical list for phones, quarter lanes for a roadmap, bars for tasks that overlap (a Gantt chart), and a line to scale for history. The 12 examples below cover each one, with the use and the limits of each layout.
Which timeline do you need?
| Your job | Layout | Example |
|---|---|---|
| Show the phases of one project | Horizontal line with milestones | 1. Project plan |
| Share a plan without exact dates | Quarters with lanes | 2. Product roadmap |
| Show tasks that overlap | Gantt chart (bars) | 3. Gantt chart |
| Tell a story over years | Years as headlines | 4. Company history |
| Make it readable on a phone | Vertical list | 5. Vertical timeline |
| Count back from a fixed day | Countdown blocks | 6. Launch countdown |
| Show where a project is today | Line with a Today flag | 10. Status update |
12 timeline examples
Each example below is a 16:9 slide we built in code for this page. The content is made up, except example 8, which uses real dates. Select a name to jump to it.
Website redesign plan
Jan
Kickoff
Feb
Research
Mar
Design
Apr–May
Build
Jun
Launch
1Project plan
HorizontalA kickoff or team update: the phases of one project in order.
- 5 milestones
- Months
- Done = filled
Example built for this page. Made-up content.
Product roadmap: next 4 quarters
App
Offline modeNew editorWebsite
PricingHelp centerSales
Partner programQ1Q2Q3Q42Product roadmap
RoadmapA roadmap for a board, investors or customers. Quarters promise less than dates.
- 3 lanes
- Quarters
- No exact dates
Example built for this page. Made-up content.
Office move: 8-week plan
Pick a space
Sign the lease
Plan the layout
Order furniture
Move
Unpack
W1W2W3W4W5W6W7W83Gantt chart
GanttTasks that overlap, each with a start and an end. The line shows today.
- 6 tasks
- Weeks
- Today line
Example built for this page. Made-up content.
Our bakery, 2015 to today
2015
Founded
2017
First shop
2019
Online orders
2022
Second city
2025
New brand
4Company history
HistoryAn about-us slide, a pitch deck or a new-hire deck. The year is the headline.
- 5 milestones
- Years
- One event a year
Example built for this page. Made-up content.
Wedding day schedule
- 14:00Ceremony
- 15:00Photos in the garden
- 17:00Dinner
- 20:00First dance
- 23:00Send-off
5Vertical timeline
VerticalA schedule people read on a phone. Each row has room for a longer label.
- 5 times
- Reads top down
- Fits a phone
Example built for this page. Made-up content.
Launch countdown
8weeks
Teaser
4weeks
Waitlist
2weeks
Press kit
1week
Final test
0days
Launch day
6Launch countdown
CountdownA launch or event plan counted back from one fixed day.
- 5 steps
- Weeks to go
- Last box in yellow
Example built for this page. Made-up content.
One designer, 2018 to 2025
Study
DegreeJobs
Junior designerLead designerSide work
Freelance201820192020202120222023202420257Career timeline
CareerAn interview, a portfolio or an about-me slide. Study and side work overlap with jobs.
- 3 lanes
- Years
- Overlaps show
Example built for this page. Made-up content.
The Space Race, to scale
1957
Sputnik 1
1958
NASA begins
1961
First human in space
1965
First spacewalk
1969
Moon landing
8History class
HistoryA school or history talk. Gaps to scale show that 1961 to 1965 took four years.
- 5 events
- To scale
- Real dates
Example built for this page. Dates: NASA history.
Our hiring process
- ApplyDay 1
- ScreenWeek 1
- InterviewWeek 2
- OfferWeek 3
- StartWeek 5
9Process timeline
ProcessSteps that always come in the same order, with how long each one takes.
- 5 steps
- Time per step
- Arrows
Example built for this page. Made-up content.
Where the project is today
TodayPlan
Done
Design
Done
Build
In progress
Test
Next
Launch
Next
10Status update
HorizontalA weekly status slide. People see what is done and what is next at a glance.
- 5 phases
- Status labels
- Today flag
Example built for this page. Made-up content.
My first 90 days
- Days 1–30
Learn
- Meet the team
- Learn the product
- Days 31–60
Contribute
- Own one project
- Fix one process
- Days 61–90
Lead
- Ship the project
- Plan the next quarter
1130-60-90 day plan
PhasesA job interview or a new manager plan. Few phases, a goal list under each.
- 3 phases
- 2 goals each
- Columns
Example built for this page. Made-up content.
- Days 1–30
Plan vs actual
Plan
DesignBuildTestActual
DesignBuildTestJanFebMarAprMayJunJulAug12Plan vs actual
GanttA project review. Two rows of the same phases show where the time went.
- 2 rows
- Months
- Slip shows
Example built for this page. Made-up content.
Timeline layout rules
These rules come from the examples above. Each one has a reason you can see on the slides.
| Rule | Why | Seen in |
|---|---|---|
| 4 to 7 milestones per horizontal line | At 8 or more, labels get small or overlap | Examples 1, 4, 10 |
| 1 to 3 words per label | The audience reads a label in one look | Examples 1, 9 |
| One date unit per slide | Mixed "Q2" and "May 14" makes the gaps hard to read | Examples 2, 3 |
| One accent color | It marks the one thing to see: done, today or the end | Examples 3, 6, 10 |
| Bars when tasks overlap | Dots cannot show a start and an end | Examples 3, 7, 12 |
| To scale only when gaps matter | Even spacing hides that one gap is 4 years and another is 1 | Example 8 |
A vertical timeline gives each row the full slide width, so a label can be 3 or 4 words (example 5). A horizontal timeline shares the width between all milestones, so keep it to 1 to 3 words.
When a timeline should be a Gantt chart
Use dots on a line when each event is one moment: a launch, a founding year, a deadline. Use bars when each item takes time and items overlap, as in examples 3 and 12. That is a Gantt chart. A roadmap (example 2) is a Gantt chart with quarters in place of weeks and no task owners, which makes it safer to show outside the team.
For a long project with many tasks, a slide is too small. Keep the full plan in your project tool and put only the 5 to 8 main tasks on the slide. Our think-cell alternatives page compares PowerPoint add-ins that draw Gantt charts.
How to make a timeline in PowerPoint
PowerPoint has two built-in timeline layouts in SmartArt (Basic Timeline and Circle Accent Timeline), or you can draw any of the examples above from a line, circles and text boxes. Our guide how to make a timeline in PowerPoint has the steps for Windows, Mac and the web, with the Align and Distribute tricks that keep the gaps even.
How to make a timeline in Google Slides
Google Slides has a diagram gallery with timeline layouts:
- Open your presentation and go to the slide.
- At the top, click Insert > Diagram.
- In the panel that opens, pick the timeline group. Choose a style, the number of levels (dates) and a template.
- Click the template. Google Slides adds it to the slide, and you can edit every text box.
Insert
- Image
- Text box
- Audio
- Video
- Shape
- Table
- Chart
- Diagram
- Word art
- Line
Google's help names Insert > Diagram and says to "choose your style, number of levels, and template". It does not name the groups in the panel. Guides such as How-To Geek list six: Grid, Hierarchy, Timeline, Process, Relationship and Cycle. Diagrams work in any language that uses the Latin alphabet. Source: Google, Insert and arrange text, shapes, diagrams, and lines, checked November 27, 2026.
To build a custom timeline like the examples above, draw it from shapes:
- Click Insert > Line and draw the line across the slide.
- Click Insert > Shape and add a circle for each milestone. Copy and paste the first circle to keep them the same size.
- Add a text box for each date and label.
- Select all the circles. Click Arrange > Distribute to make the gaps even. This needs 3 or more objects, and Arrange > Align puts them on one line.
Make a timeline slide with GenPPT
Type your milestones and dates in one sentence. GenPPT designs the timeline slide in the style of the rest of your deck. The Export menu has PowerPoint and PDF. On paid plans it also has Editable PowerPoint: GenPPT queues the job and sends the file by email, with the text as real text boxes. See editable PowerPoint examples for what that file looks like.
FAQ
What is a timeline example?
A timeline example is a sample slide or chart that shows events in date order. Common types are a horizontal timeline, a vertical timeline, a roadmap, a Gantt chart and a history timeline. This page shows 12, each for a different use.
How many milestones should a timeline have?
Keep 4 to 7 milestones on one horizontal line. With more, the labels get small or overlap. Split a long history over two slides, or use a vertical timeline, which gives each row more room.
What is the difference between a timeline and a Gantt chart?
A timeline shows moments: one dot per event. A Gantt chart shows tasks that take time, as bars with a start and an end, and shows when tasks overlap. Use a Gantt chart for project plans with tasks that run at the same time.
How do I make a timeline in Google Slides?
Click Insert > Diagram, pick the timeline group, then choose a style, the number of levels and a template. Click the template to add it, then type your dates. For a custom look, draw a line and circles from Insert and use Arrange > Distribute to space them.
What is a good timeline for a school project?
A history timeline to scale, like the Space Race example on this page. Place each event at its true distance on the line, so the class can see which gaps were long. Keep one short label per event and give the year in bold.
Can I make a timeline vertical?
Yes. A vertical timeline reads from top to bottom and works well on phones and in portrait documents. Put the date on the left of the line and the label on the right, as in example 5.